Film Processing and Equipment Main Page
Development Stats: Two reel stainless steel tank, inversion and twist agitation.
1. All temps at 22C. 2. Develop HC-110 Dilution 1:41, 30 seconds initial agitation then 5 seconds of standard agitation evry 60 seconds. 3. Stop with water 22c, two- four dumps. 4. TF-4 bath 1, two minute clear, TF2 bath 2, two minute fix. Same agitation as developing. 5. Rinse 5 changes of water, with 30 seconds vigorous shaking between changes. Soak five minutes, change water three times and repeat 6 times. 6. Distilled water spray 7. Hang dry 1 hour |
ITS THE LENS!!!