Film Processing and Equipment    Main Page 

 

 

 

Development Stats:  Two reel stainless steel tank, inversion and twist agitation.

 

1.  All temps at 22C.

2.  Develop  HC-110 Dilution 1:41, 30 seconds initial agitation then 5 seconds of standard agitation evry 60 seconds.

3.  Stop with water 22c,  two- four dumps.

4.  TF-4 bath 1, two minute clear, TF2 bath 2, two minute fix.  Same agitation as developing.

5. Rinse 5 changes of water, with 30 seconds vigorous shaking between changes.  Soak five minutes, change water three times and repeat 6 times. 

6. Distilled water spray

7. Hang dry 1 hour

 

 

ITS THE LENS!!!